Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 13, 2013Dayton Tap Line Retirement
CX(s) Applied: B4.10
Date: 08/13/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp’s removal of associated equipment. The Dayton Tap facility was constructed within PacificCorp’s transmission line right-of-way to establish a transmission line tap from PacificCorp’s transmission line to a BPA customer. Since the customer will no longer be served via this tap, the Dayton Tap facility is no longer needed.
CX(s) Applied: B4.10
Date: 08/13/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp’s removal of associated equipment. The Dayton Tap facility was constructed within PacificCorp’s transmission line right-of-way to establish a transmission line tap from PacificCorp’s transmission line to a BPA customer. Since the customer will no longer be served via this tap, the Dayton Tap facility is no longer needed.