CX-010645: Categorical Exclusion Determination

Pittsburgh Building 84 Gas Line Project CX(s) Applied: B2.5 Date: 06/26/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

June 26, 2013
Estimated Read Time   min
Pittsburgh Building 84 Gas Line Project
CX(s) Applied: B2.5
Date: 06/26/2013
Location(s): Pennsylvania
Offices(s): National Energy Technology Laboratory

Relocation of above ground natural gas pipeline northwest of Bldg. 84. Removal of approximately 300 feet of existing above ground pipe and installation of approximately 100 feet of above ground pipe.