Tanks 13 and 15 Soil Samples for Transfer Line Future Design CX(s) Applied: B3.1 Date: 04/26/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 26, 2013Tanks 13 and 15 Soil Samples for Transfer Line Future Design
CX(s) Applied: B3.1
Date: 04/26/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction to perform exploratory holes for proposed transfer line supports between Tanks 13 and 15.
CX(s) Applied: B3.1
Date: 04/26/2013
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Construction to perform exploratory holes for proposed transfer line supports between Tanks 13 and 15.