Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670 CX(s) Applied: B2.5 Date: 11/29/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
November 29, 2012Upgrade to the Concrete Masonry Unit (CMU) Wall at Test Reactor Area (TRA)-670
CX(s) Applied: B2.5
Date: 11/29/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The purpose of this project is to ensure the concrete masonry unit (CMU) separating the control room and the Reactor Data Acquisition System (RDAS) room located at TRA-670 meets the PC-4 seismic standard.