Communication Line Installation Between Manhole F-39 and Building 221-12F CX(s) Applied: B1.7 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
November 27, 2012Communication Line Installation Between Manhole F-39 and Building 221-12F
CX(s) Applied: B1.7
Date: 11/27/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed oxide (MOX) services proposes to install a communication cable beginning at the existing Manhole F-39 and ending at the southwest corner of Building 221-12F.
CX(s) Applied: B1.7
Date: 11/27/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Mixed oxide (MOX) services proposes to install a communication cable beginning at the existing Manhole F-39 and ending at the southwest corner of Building 221-12F.