Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements CX(s) Applied: B1.3 Date: 10/18/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
October 18, 2012Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements
CX(s) Applied: B1.3
Date: 10/18/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to replace disconnect switches and related equipment on the Franklin-Badger Canyon No. 2 and Grandview-Red Mountain No. 1 115 kilovolt transmission lines.