Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
July 25, 2012"Operation of 3013 Outer Can Welder (OCW)
CX(s) Applied: B1.3
Date: 07/25/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Assemble, operate, and maintain the 3013 outer can welder (OCW) in 723-15A as needed by other projects."
CX(s) Applied: B1.3
Date: 07/25/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Assemble, operate, and maintain the 3013 outer can welder (OCW) in 723-15A as needed by other projects."