Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering – Rensselaer Polytechnic Institute CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
January 4, 2012Rensselaer Infrastructure Upgrade to Enhance Research and Education in Nuclear Engineering – Rensselaer Polytechnic Institute
CX(s) Applied: B3.6
Date: 01/04/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The scope of the project includes purchasing a new Spark Plasma Sintering (SPS) system. The new equipment will be primarily used to advance the cutting edge research in the innovative materials design including fuel, structural, and waste form materials.
CX(s) Applied: B3.6
Date: 01/04/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The scope of the project includes purchasing a new Spark Plasma Sintering (SPS) system. The new equipment will be primarily used to advance the cutting edge research in the innovative materials design including fuel, structural, and waste form materials.