Acquisition of Specific Equipment to Enhance Performance, Control and Operational Capability of the University of Utah TRIGA Facilities CX(s) Applied: B2.2 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Office of NEPA Policy and Compliance
May 17, 2012Acquisition of Specific Equipment to Enhance Performance, Control and Operational Capability of the University of Utah TRIGA Facilities
CX(s) Applied: B2.2
Date: 05/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The objective of this project is to replace the University of Utah TRIGA Reactor heavy water-element handling tool and underwater vacuum cleaner, and to add a portable spectroscopy system an broad energy germanium detector to the facility operational capabilities.
CX(s) Applied: B2.2
Date: 05/17/2012
Location(s): Idaho
Offices(s): Idaho Operations Office
The objective of this project is to replace the University of Utah TRIGA Reactor heavy water-element handling tool and underwater vacuum cleaner, and to add a portable spectroscopy system an broad energy germanium detector to the facility operational capabilities.