Eliminate the Capability to Transfer HB-Line Filtrate Solution (Tanks NT-51/52) to H Canyon Tank 8.8 CX(s) Applied: B2.5 Date: 04/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 30, 2012Eliminate the Capability to Transfer HB-Line Filtrate Solution (Tanks NT-51/52) to H Canyon Tank 8.8
CX(s) Applied: B2.5
Date: 04/30/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Reconfigure existing valve and pipe configurations to eliminate the capability to transfer filtrate solutions from Tank NT-51/52 to Canyon Tank 8.8.