All Electric Subsea Autonomous High Integrity Pressure Protection System CX(s) Applied: A9, A11, B3.6 Date: 07/16/2012 Location(s): New York Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 16, 2012All Electric Subsea Autonomous High Integrity Pressure Protection System
CX(s) Applied: A9, A11, B3.6
Date: 07/16/2012
Location(s): New York
Offices(s): National Energy Technology Laboratory
Technology research, engineering design and analysis, and laboratory-scale testing of new electro-mechanical actuator mechanisms for fail-safe valve closure.
CX(s) Applied: A9, A11, B3.6
Date: 07/16/2012
Location(s): New York
Offices(s): National Energy Technology Laboratory
Technology research, engineering design and analysis, and laboratory-scale testing of new electro-mechanical actuator mechanisms for fail-safe valve closure.