Missouri-City-St. Joseph CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 07/02/2012 Location(s): Missouri Offices(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
July 2, 2012Missouri-City-St. Joseph
CX(s) Applied: A9, B1.32, B2.5, B5.1
Date: 07/02/2012
Location(s): Missouri
Offices(s): Energy Efficiency and Renewable Energy
1) Install fluorescent lighting system, new temperature sensors, and other heating, ventilation, and air conditioning (HVAC) controls to tie into the building management system of the ice skating rink, 2) install lighting fixtures and HVAC ductwork configuration upgrades at the St. Joseph Animal Control and Rescue Facility, 3) upgrade traffic signals to light-emitting diodes, 4) conduct audits of city facilities, and 5) upgrade parking garage lighting.
CX(s) Applied: A9, B1.32, B2.5, B5.1
Date: 07/02/2012
Location(s): Missouri
Offices(s): Energy Efficiency and Renewable Energy
1) Install fluorescent lighting system, new temperature sensors, and other heating, ventilation, and air conditioning (HVAC) controls to tie into the building management system of the ice skating rink, 2) install lighting fixtures and HVAC ductwork configuration upgrades at the St. Joseph Animal Control and Rescue Facility, 3) upgrade traffic signals to light-emitting diodes, 4) conduct audits of city facilities, and 5) upgrade parking garage lighting.