Renovation of E-Wing Ventilation, Building 773-A CX(s) Applied: B2.1 Date: 04/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
April 18, 2012Renovation of E-Wing Ventilation, Building 773-A
CX(s) Applied: B2.1
Date: 04/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Y646 is the current project underway to address Modification 2 of the original Commercial Modification Scope Document (CMSD). CMSD was originated to modify the E-Wing heating, ventilation and air conditioning (HVAC) Ventilation System to improve the air flow balance; and to improve radiological confinement and contamination control. These modifications are based on the results of an SRTC Computer Model for 773-A which was performed by Systems Engineering. Revision 3 - Added description and scope for the use of a Temporary Modification for 773-A F-080 exhaust system.
CX(s) Applied: B2.1
Date: 04/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Y646 is the current project underway to address Modification 2 of the original Commercial Modification Scope Document (CMSD). CMSD was originated to modify the E-Wing heating, ventilation and air conditioning (HVAC) Ventilation System to improve the air flow balance; and to improve radiological confinement and contamination control. These modifications are based on the results of an SRTC Computer Model for 773-A which was performed by Systems Engineering. Revision 3 - Added description and scope for the use of a Temporary Modification for 773-A F-080 exhaust system.