Remove Abandoned Bayou Choctaw Timber Bridge Over North/South Canal CX(s) Applied: B1.23 Date: 05/03/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
May 3, 2012Remove Abandoned Bayou Choctaw Timber Bridge Over North/South Canal
CX(s) Applied: B1.23
Date: 05/03/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all materials, labor, equipment, supplies, transportation, facilities, supervision, and services required to remove and dispose of the abandoned BC Timber Bridge over the North/South Canal. Tasks also include installation of erosion protection/bank stabilization as required.
CX(s) Applied: B1.23
Date: 05/03/2012
Location(s): Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall furnish all materials, labor, equipment, supplies, transportation, facilities, supervision, and services required to remove and dispose of the abandoned BC Timber Bridge over the North/South Canal. Tasks also include installation of erosion protection/bank stabilization as required.