CX-008279: Categorical Exclusion Determination

Building 8 Compressor Aftercooler Rupture Disc Overflow Piping Project CX(s) Applied: B1.3, B1.15 Date: 05/09/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

May 9, 2012
Estimated Read Time   min
Building 8 Compressor Aftercooler Rupture Disc Overflow Piping Project
CX(s) Applied: B1.3, B1.15
Date: 05/09/2012
Location(s): West Virginia
Offices(s): National Energy Technology Laboratory

Overflow piping and remove and replace rupture disc for two overflow pipes for the aftercoolers of the 700 pound per square inch compressors.