Advanced Formation Evaluator Tools (Haliburton) CX(s) Applied: B3.7 Date: 09/11/2011 Location(s): Wyoming Offices(s): RMOTC
Office of NEPA Policy and Compliance
September 11, 2011Advanced Formation Evaluator Tools (Haliburton)
CX(s) Applied: B3.7
Date: 09/11/2011
Location(s): Wyoming
Offices(s): RMOTC
The purpose of this project is to deepen the 45-3-X-21 well through the Ten Sleep, Amsden, Madison, etc. The test will last for 10 days and will involve drilling and under-reaming a section of the well using LWD technology and logging repeat sections of the well for comparison of the performance of the tool. This test will use standard KCL Polymer drilling mud. There should be another test coming in so the well will be left as is. There is a cost allowance for a plug back.
CX(s) Applied: B3.7
Date: 09/11/2011
Location(s): Wyoming
Offices(s): RMOTC
The purpose of this project is to deepen the 45-3-X-21 well through the Ten Sleep, Amsden, Madison, etc. The test will last for 10 days and will involve drilling and under-reaming a section of the well using LWD technology and logging repeat sections of the well for comparison of the performance of the tool. This test will use standard KCL Polymer drilling mud. There should be another test coming in so the well will be left as is. There is a cost allowance for a plug back.