Weld Substation Control Building Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/03/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Office of NEPA Policy and Compliance
February 3, 2012Weld Substation Control Building Heating, Ventilation and Air Conditioning Replacement
CX(s) Applied: B1.4
Date: 02/03/2012
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) will replace a heating, ventilation and air conditioning (HVAC) system at the Weld Substation. The substation occurs in Section 5, T.5N, R.66W at 104' 48' 26" and 40' 25' 38" in Weld County. The proposed work consists of removing existing wall-mounted HVAC air conditioning units, repairing walls where units occurred, and installing new HVAC systems.
CX(s) Applied: B1.4
Date: 02/03/2012
Location(s): Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration (Western) will replace a heating, ventilation and air conditioning (HVAC) system at the Weld Substation. The substation occurs in Section 5, T.5N, R.66W at 104' 48' 26" and 40' 25' 38" in Weld County. The proposed work consists of removing existing wall-mounted HVAC air conditioning units, repairing walls where units occurred, and installing new HVAC systems.