Fiscal Year 2012 Annual Site Subsidence Surveys CX(s) Applied: B3.1 Date: 01/18/2012 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
January 18, 2012Fiscal Year 2012 Annual Site Subsidence Surveys
CX(s) Applied: B3.1
Date: 01/18/2012
Location(s): Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, materials, equipment, transportation, and services necessary to perform a subsidence survey of the Bayou Choctaw, Big Hill, Bryan Mound and West Hackberry Strategic Petroleum Reserve sites.
CX(s) Applied: B3.1
Date: 01/18/2012
Location(s): Texas, Louisiana
Offices(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, supervision, materials, equipment, transportation, and services necessary to perform a subsidence survey of the Bayou Choctaw, Big Hill, Bryan Mound and West Hackberry Strategic Petroleum Reserve sites.