Fire Suppression System Modifications, 772-1F CX(s) Applied: B2.5 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 18, 2012Fire Suppression System Modifications, 772-1F
CX(s) Applied: B2.5
Date: 01/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Installation of a Fire Department Connection (FDC) on the northeast corner of 772-1F and extending sprinkler coverage to additional labs. In addition, install a Post Indicating Isolation Valve (PIV) in the 772-1F courtyard.
CX(s) Applied: B2.5
Date: 01/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Installation of a Fire Department Connection (FDC) on the northeast corner of 772-1F and extending sprinkler coverage to additional labs. In addition, install a Post Indicating Isolation Valve (PIV) in the 772-1F courtyard.