Scaled Saltstone Mixer Commissioning CX(s) Applied: B3.6 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
January 18, 2012Scaled Saltstone Mixer Commissioning
CX(s) Applied: B3.6
Date: 01/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to commission the Saltstone Scaled Mixer for operation.
CX(s) Applied: B3.6
Date: 01/18/2012
Location(s): South Carolina
Offices(s): Savannah River Operations Office
Tests will be conducted in the Engineering Development Laboratory (EDL, bldg. 786-A) to commission the Saltstone Scaled Mixer for operation.