Repair Flowline 100 Feet North of 71-3-SX-3CX(s) Applied: B5.2, B5.4Date: 02/16/2010Location(s): Casper, WyomingOffice(s): RMOTC
Office of NEPA Policy and Compliance
February 16, 2010CX(s) Applied: B5.2, B5.4
Date: 02/16/2010
Location(s): Casper, Wyoming
Office(s): RMOTC
The project consists of an emergency repair for a flowline leak north of 71-3-SX-3. Dug up pipeline, repaired line and backfilled with clean fill dirt. Oil contaminated soil was hauled to the east side landfarm and clean dirt was brought in from section 20.