West Hackenberry Raw Water Intake Structure Clear ZoneCX(s) Applied: B1.3Date: 06/29/2011Location(s): Lake Charles, LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Office of NEPA Policy and Compliance
June 29, 2011CX(s) Applied: B1.3
Date: 06/29/2011
Location(s): Lake Charles, Louisiana
Office(s): Strategic Petroleum Reserve Field Office
Subcontractor shall provide all labor, tools, equipment, transportation, and supervision required to cut trees, brush and grass to make a "clear zone" approximately 110 feet around the perimeter of the West Hackenberry Raw Water Intake Structure. Tasks include machine clearing standing vegetation performed with cutting/grinding equipment that minimizes disturbance of the surface of the soil or root system. Trees and brush shall be removed down to approximately ground/water level. Trees and bush shall be shredded and disposed of on the right-of-way.