M-Area Chemical Oxidation (MACO) Phase II: Vadose Zone Implant InstallationCX(s) Applied: B3.1Date: 12/02/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Office of NEPA Policy and Compliance
December 2, 2010CX(s) Applied: B3.1
Date: 12/02/2010
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office
The M-Area Chemical Oxidation (MACO) project is a technical demonstration of in situ chemical oxidation (ISCO). Up to three soil vapor monitoring implants will be installed in the vadose zone of a location near the A-014 Outfall in the A/M Area.