CPP-663 Heating, Ventilation and Air Conditioning Systems UpgradeCX(s) Applied: B2.1Date: 12/10/2010Location(s): IdahoOffice(s): Idaho Operations Office
Office of NEPA Policy and Compliance
December 10, 2010CX(s) Applied: B2.1
Date: 12/10/2010
Location(s): Idaho
Office(s): Idaho Operations Office
The scope of work will be to repair and/or replace the existing heating, ventilation, and air conditioning system located in building CPP-663 at the Idaho National Engineering Laboratory. The scope will be to repair the existing system or identify an energy efficient replacement to the existing system and place a National Fire Protection Association (NFPA) 70E code compliant electrical metering system that will monitor building electrical usage. CPP-663 is a two story maintenance/craft warehouse building. The building houses offices, maintenance shops, storage rooms, and other support functions.