Kansas-City-Overland ParkCX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1Date: 10/13/2010Location(s): Overland Park, KansasOffice(s): Energy Efficiency and Renewable Energy
Office of NEPA Policy and Compliance
October 13, 2010CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1
Date: 10/13/2010
Location(s): Overland Park, Kansas
Office(s): Energy Efficiency and Renewable Energy
Energy Efficiency and Conservation Block Grant Program. 1) Hire consultant to develop energy efficiency and conservation strategy, 2) energy efficiency upgrades at 4 city buildings (e.g., replacement of air-cooled condensers, heating boiler system, roofs, and cooling tower systems), 3) install fiber optic cable and Closed Circuit Television (CCTV) cameras, 4) bike trails, 5) develop new building codes and construct table-top model of downtown Overland Park area, and 6) install light-emitting diode street lights.