Modifications to the Sanitary Sewer Line 920 PlateauCX(s) Applied: B1.3, B1.32, B2.1, B2.5Date: 09/24/2010Location(s): Pittsburgh, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
September 24, 2010CX(s) Applied: B1.3, B1.32, B2.1, B2.5
Date: 09/24/2010
Location(s): Pittsburgh, Pennsylvania
Office(s): Fossil Energy, National Energy Technology Laboratory
The intent of this project is to eliminate sewer plugging by the removal of three existing manholes and replacing them with grinder lift stations.