CX-004209: Categorical Exclusion Determination

Building 922 Uninterruptable Power System (UPS) ReplacementCX(s) Applied: B2.1Date: 09/27/2010Location(s): Allegheny County, PennsylvaniaOffice(s): National Energy Technology Laboratory

Office of NEPA Policy and Compliance

September 27, 2010
Estimated Read Time   min
Building 922 Uninterruptable Power System (UPS) Replacement
CX(s) Applied: B2.1
Date: 09/27/2010
Location(s): Allegheny County, Pennsylvania
Office(s): National Energy Technology Laboratory

Building 922 - remove and replace the existing Computer Room Uninterruptable Power System.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD