Pier 2 ProjectCX(s) Applied: B5.1Date: 08/10/2010Location(s): San Francisco, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
August 10, 2010CX(s) Applied: B5.1
Date: 08/10/2010
Location(s): San Francisco, California
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
The objective of this project is to retrofit the heating and ventilation system in the pavilion and install rooftop photovoltaic (PV) system and hydronic radiant floor system.