CX-003956: Categorical Exclusion Determination

L Area Disassembly Basin Rack Removal / Installation ProjectCX(s) Applied: B1.3Date: 09/15/2010Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office

Office of NEPA Policy and Compliance

September 15, 2010
Estimated Read Time   min
L Area Disassembly Basin Rack Removal / Installation Project
CX(s) Applied: B1.3
Date: 09/15/2010
Location(s): Aiken, South Carolina
Office(s): Savannah River Operations Office

This project will remove Horizontal Tube Storage (HTS) racks from the Disassembly Basin and install Modular Tube Storage (MTS) Racks, an unloading station/stand, through row blocks, monorail upgrades and modification to the Shielded Transfer System (STS) including changeout of the carriage assembly. Revision 1: Project scope has been modified to only include Modular Tube Storage Racks and associated changes to support those racks (STS changes, monorail upgrades, through row blocks, unloading station).