CX-003686: Categorical Exclusion Determination

Building 4 Electrical UpgradeCX(s) Applied: B2.3, B2.5Date: 09/01/2010Location(s): Albany, OregonOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Office of NEPA Policy and Compliance

September 1, 2010
Estimated Read Time   min
Building 4 Electrical Upgrade
CX(s) Applied: B2.3, B2.5
Date: 09/01/2010
Location(s): Albany, Oregon
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

This project involves the installation of 15 kilovolt switchgear and power distribution in Building 4 including heating and ventilating systems and building finishes.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD