Installation of Metering Equipment at Existing Facilities for Power Scheduling
CX(s) Applied: B4.6
Date: 07/12/2010
Location(s): Lewis County, Washington
Office(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to install meter equipment at multiple locations in Lewis County, Washington. The project is needed as Lewis county Public Utility Distribution plans to become a BPA Slice customer and needs to obtain meter data at 5 minute intervals. The acquisition of meter data at 5 minute intervals is required of BPA Slice customers to perform power scheduling. In order to provide this data, BPA needs to install meter equipment by January 1, 2011.