Determination of the Impact of a Carbon Dioxide Mitigation Technology on Mercury EmissionsCX(s) Applied: B3.6, A9Date: 07/09/2010Location(s): Windsor, ConnecticutOffice(s): Fossil Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
July 9, 2010Determination of the Impact of a Carbon Dioxide Mitigation Technology on Mercury Emissions
CX(s) Applied: B3.6, A9
Date: 07/09/2010
Location(s): Windsor, Connecticut
Office(s): Fossil Energy, National Energy Technology Laboratory
ALSTOM's tangentially-fired 15-megawatt Boiler Simulation Facility will host a five-day oxycombustion test to evaluate mercury speciation and removal across a fabric filter.