Keeler-Tillamook Pole Stub Install on David Hill Road ExtensionCX(s) Applied: B4.13Date: 05/05/2010Location(s): Washington County, OregonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 5, 2010CX(s) Applied: B4.13
Date: 05/05/2010
Location(s): Washington County, Oregon
Office(s): Bonneville Power Administration
Design, purchase materials, and construct a guyed stub pole to accommodate the David Hill Road Extension Project across the street from Bonneville Power Administration's structure 14/2 on the Keeler-Tillamook Number-1 transmission line.