CX-002236: Categorical Exclusion Determination

C-Farm Electrical, Lighting, and Walkway UpgradesCX(s) Applied: B1.13, B2.1, B1.3Date: 04/27/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office

Office of NEPA Policy and Compliance

April 27, 2010
Estimated Read Time   min
C-Farm Electrical, Lighting, and Walkway Upgrades
CX(s) Applied: B1.13, B2.1, B1.3
Date: 04/27/2010
Location(s): Richland, Washington
Office(s): Environmental Management, Office of River Protection-Richland Office

The U.S. Department of Energy Office of River Protection and the Richland Operations Office propose to upgrade and add various electrical components and wiring within the C and AN tank farms, and will install lighting and a walkway in and between AN and C tank farms in fiscal year 2010.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD