CX-002221: Categorical Exclusion Determination

Androscoggin Replaces Controls for Air Cooling for CourtroomCX(s) Applied: B2.2, B1.4, B5.1Date: 05/11/2010Location(s): Androscoggin County, MaineOffice(s): Energy Efficiency and Renewable Energy

Office of NEPA Policy and Compliance

May 11, 2010
Estimated Read Time   min
Androscoggin Replaces Controls for Air Cooling for Courtroom
CX(s) Applied: B2.2, B1.4, B5.1
Date: 05/11/2010
Location(s): Androscoggin County, Maine
Office(s): Energy Efficiency and Renewable Energy

Energy Efficiency and Conservation Block Grant Program. The County Building was built in 1854 and serves at the hub of many activities for the residents of the County. The facility has an air cooling system for the Superior Courtroom. This room is cooled by one unit and it needs more efficient controls. At this time we are unable to control the temperature of this room. This project will replace controls that are over 50 years old. This will result in savings of energy and will reduce carbon dioxide emissions.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD