NCS PowerCX(s) Applied: B5.1Date: 02/23/2010Location(s): WashingtonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
February 23, 2010CX(s) Applied: B5.1
Date: 02/23/2010
Location(s): Washington
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
The project involves moving an light-emitting diode (LED) fixture assembly line from China into an existing building that was constructed in 1976 in the Camas/Washougal Port area.