CX-001721: Categorical Exclusion Determination

Recovery Act: Baseline System Costs for 50.0 Megawatt Enhanced Geothermal System - A Function of Working Fluid, Technology and LocationCX(s) Applied: A9Date: 04/16/2010Location(s): ConnecticutOffice(s): Energy Efficiency and Renewable Energy, Golden Fi...

Office of NEPA Policy and Compliance

April 16, 2010
Estimated Read Time   min
Recovery Act: Baseline System Costs for 50.0 Megawatt Enhanced Geothermal System - A Function of Working Fluid, Technology and Location
CX(s) Applied: A9
Date: 04/16/2010
Location(s): Connecticut
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Gas Equipment Engineering Corporation (GEEC) would develop a baseline cost model and analyze key parameters driving cost variations in Enhanced Geothermal System (EGS) development.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD