CX-001518: Categorical Exclusion Determination

Re-seal Polyurethane Overcoat on BH Substation Relay Building 814CX(s) Applied: B1.3Date: 04/07/2010Location(s): TexasOffice(s): Fossil Energy, Strategic Petroleum Reserve Field Office

Office of NEPA Policy and Compliance

April 7, 2010
Estimated Read Time   min
Re-seal Polyurethane Overcoat on BH Substation Relay Building 814
CX(s) Applied: B1.3
Date: 04/07/2010
Location(s): Texas
Office(s): Fossil Energy, Strategic Petroleum Reserve Field Office

Subcontractor shall furnish all services, tools, equipment, supplies, transportation, facilities, labor, supervision, and materials needed to repair, clean, and re-coat the existing Polyurethane Foam Roofing System on the BH Substation relay Building 814.