Decatur Work Release 10 Kilowatt Photovoltaic ArrayCX(s) Applied: B5.1Date: 03/24/2010Location(s): Decatur, AlabamaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Office of NEPA Policy and Compliance
March 24, 2010CX(s) Applied: B5.1
Date: 03/24/2010
Location(s): Decatur, Alabama
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Installation of 10 kilowatt fixed-tilt, fixed axis array mounted on existing building (Building J) at Decatur Work Release in Decatur, Alabama.