CX-000997: Categorical Exclusion Determination

Biodiesel Infrastructure Project (PrairieFire)CX(s) Applied: A1, A9, B5.1Date: 01/27/2010Location(s): Monona, WisconsinOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory

Office of NEPA Policy and Compliance

January 27, 2010
Estimated Read Time   min

Biodiesel Infrastructure Project (PrairieFire)
CX(s) Applied: A1, A9, B5.1
Date: 01/27/2010
Location(s): Monona, Wisconsin
Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory


The project will only require placing the kiosk on already present concrete and then running electrical wire. Install dispenser capability of choosing between three owner-set blends of biodiesel and petro diesel fuel. This will also involve setting the kiosk and running electrical wiring to the kiosk.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD