Central Facilities Area-696 Power and Plumbing UpgradesCX(s) Applied: B1.7, B2.1Date: 02/01/2010Location(s): IdahoOffice(s): Idaho Operations Office, Nuclear Energy
Office of NEPA Policy and Compliance
February 1, 2010CX(s) Applied: B1.7, B2.1
Date: 02/01/2010
Location(s): Idaho
Office(s): Idaho Operations Office, Nuclear Energy
There is insufficient electrical power in the East Bay and the West Bay of the Central Facility Area Transportation Complex to allow the craftsmen to fully utilize the available floor space without the use of extension cords. Additionally, a new hydraulic hose clamper is to be installed in the Parts Room and it needs a dedicated 30 ampere power supply. The craftsmen also need another wash sink in the East Bay. The current method of connecting to the internet using Local Area Network cables is cumbersome and inefficient. There is not enough lighting in the north side of the southeast section of the East Bay. This project installs the necessary electrical service, additional plumbing, and wireless internet capability to address the listed problems.