Texas Tech Great Plains Wind Power Test FacilityCX(s) Applied: A9, B3.1, B5.1Date: 11/30/2009Location(s): TexasOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Office of NEPA Policy and Compliance
November 30, 2009Texas Tech Great Plains Wind Power Test Facility
CX(s) Applied: A9, B3.1, B5.1
Date: 11/30/2009
Location(s): Texas
Office(s): Energy Efficiency and Renewable Energy, Golden Field Office
The objectives of the project are to continue development of a nationally-recognized facility for the testing, characterization and improvement of grid-connected wind turbines and integrated wind-water desalination systems and to provide education and outreach on these topics.