The San Diego County Tribal Residential Solar Program (the project) will consist of the design, installation, inspection, and interconnection of 42 grid-tied, net-metered rooftop and ground-mount solar electric systems, totaling approximately 170 kilowatts (kW) rated capacity. Learn more about this project or find details in the below status reports.