Voluntary Protection Program Onsite Review, Waste Isolation Pilot Plant - March 2010

Evaluation to determine whether the Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

Office of Environment, Health, Safety & Security

March 26, 2010
Estimated Read Time   min

March 2010

Evaluation to determine whether the Waste Isolation Pilot Plant is continuing to perform at a level deserving DOE-VPP Star recognition.

The Team conducted its review during March 23-26, 2010 to determine whether Washington TRU Solutions, LLC is continuing to perform at a level deserving DOE-VPP Star recognition.