The following documents containing controlled unclassified information are not available to the public..
- Independent Oversight Review of Preparedness for Severe Natural Phenomena Events at the Nevada National Security Site - February 2014
- Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project Procurement Specifications Phase II, November 2011
- Review of the Concrete Batch Plant Procurement Specifications at the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project, November 2011
- Independent Evaluation of Emergency Response Facilities at the Y-12 National Security Complex, July 2011
- Review of the Procurement Specifications of the Los Alamos National Laboratory Chemistry and Metallurgy Research Replacement Project, March 2011
Documents Available for Download

Assessment of Work Planning and Control at the Savannah River Site Salt Waste Processing Facility

Study of Good Practices in Improving Disciplined Operations

This assessment evaluated the procedures that implement WIPP engineering processes, along with a representative sampling of engineering deliverables

Conducted an independent assessment of construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP).

EA assessed the effectiveness of the Paducah Site readiness assurance program, which is a sitewide program element of a DOE emergency management progr

Enterprise Assessments Assessment of the DOE Readiness Assessment Process for Restart of the Transient Reactor Test Facility at the INL

Assessment of Safety System Management at the Savannah River Site Defense Waste Processing Facility

Assessment of Work Planning and Control at the Argonne National Laboratory

Construction Quality Assessment at the Hanford Site Waste Treatment and Immobilization Plant

Lessons Learned from Assessment of Engineering Process