Issued to Amer Industrial Technologies related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site.
Issued to Intermech, Inc. related to Installation and Inspection of Anchor Bolts and Pipe Supports at the DUF6 Conversion Buildings at the Portsmouth and Paducah Gaseous Diffusion Plants
Issued to Geiger Brothers Mechanical Contractors, Inc. related to Installation and Inspection of Penetration Fire Seals at the DUF6 Conversion Building at the Portsmouth Gaseous Diffusion Plant
Issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory
Issued to Battelle Energy Alliance, LLC related to a Failed Scram Event at the Neutron Radiography Reactor at the Idaho National Laboratory
Issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site
Issued to Babcock & Wilcox Technical Services Y-12, LLC related to the Protection of Classified Information at the Y-12 National Security Complex
Issued to CH2M-Washington Group Idaho, LLC, for Electrical Safety Deficiencies at the Idaho National Laboratory
Issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory
Issued to Los Alamos National Security, LLC related to the Exposure Assessment Program and Longstanding Worker Safety and Health Program Noncompliances at the Los Alamos National Laboratory