May 18, 2022

thumbnail
Preliminary Notice of Violation, Honeywell Federal Manufacturing & Technologies, LLC

Related to machine guarding and hazardous energy control programs and a roll mill crush event at the Kansas City National Security Campus.

July 14, 2021

thumbnail
Enforcement Letter, UChicago Argonne, LLC

Related to the unauthorized access to an area designated as a Very High Radiation Area (VHRA) at Argonne National Laboratory.

July 14, 2021

thumbnail
Enforcement Letter, Consolidated Nuclear Security, LLC

Related to an employee’s dosimeter indicating a dose exceeding the limits specified in 10 C.F.R. § 835.202 at Pantex Plant.

June 24, 2021

thumbnail
Consent Order, Triad National Security, LLC

Related to low oxygen exposure events at Los Alamos National Laboratory.

June 10, 2021

thumbnail
Enforcement Letter, Brookhaven Science Associates, LLC

Related to a subcontract worker fall event at Brookhaven National Laboratory.

May 25, 2021

thumbnail
Settlement Agreement, National Technology and Engineering Solutions of Sandia, LLC

Related to the introduction of classified information into unapproved information systems and potential unauthorized disclosure of classified information at DOE’s National Nuclear Security Administration (NNSA) Sandia National Laboratories (SNL)

May 7, 2021

thumbnail
Enforcement Letter, Consolidated Nuclear Security, LLC

Related to a security incident involving the unauthorized use of classified information systems and potential disclosure of classified information by Consolidated Nuclear Security, LLC at the Pantex Plant in Amarillo, Texas.

April 13, 2021

thumbnail
Consent Order, UT-Battelle, LLC

Related to an outer fuel element failure at the High Flux Isotope Reactor (HFIR), located at the Oak Ridge National Laboratory.

March 12, 2021

thumbnail
Preliminary Notice of Violation, Jefferson Science Associates, LLC

Related to hazardous energy control events, and an electrical shock event, resulting in injury at the Thomas Jefferson National Accelerator Facility.

January 13, 2021

thumbnail
Preliminary Notice of Violation, Fluor-BWXT Portsmouth LLC

Related to deficiencies in the radiation protection program implementation at the Portsmouth Site.