Safety News
Filtered by
-
June 21, 2022A massive steel structure is rising more than 120 feet above the semiarid landscape of southeastern Washington, with construction well underway on the protective enclosure.Office of Environmental Management
-
June 21, 2022Hefty equipment passes over the Haul Road bridge in Oak Ridge. Its dark red metal stands out against the lush green East Tennessee hills.Office of Environmental Management
-
June 21, 2022A robotic arm, deployed by EM contractor Washington River Protection Solutions workers, sands, repaints and applies a fresh waterproof coating to repair a valve pit’s torn liner at the Hanford Site.Office of Environmental Management
-
June 21, 2022Kentucky’s governor recently awarded two prime contractors for EM’s Portsmouth/Paducah Project Office (PPPO) the state’s top safety and health award.Office of Environmental Management
-
June 14, 2022Over the past 24 years and spanning three liquid waste contractors, EM’s construction team at the Savannah River Site (SRS) has achieved 35 million safe hours without injury resulting in a missed day of work.Office of Environmental Management
-
June 14, 2022The EM Los Alamos Field Office (EM-LA) recently installed a hydraulic shear system, a major step toward remediating transuranic (TRU) waste contained in large, corrugated metal pipes buried underground at Los Alamos National Laboratory (LANL) since 1986.Office of Environmental Management
-
June 14, 2022Improving processes to increase efficiency and reduce waste are vital to the Hanford Site cleanup mission.Office of Environmental Management
-
June 7, 2022Workers at the Hanford Site’s Waste Treatment and Immobilization Plant (WTP) have completed critical testing of the exhaust treatment system, or offgas system, in the Low-Activity Waste (LAW) Facility.Office of Environmental Management
-
June 7, 2022Engineers from EM contractor Savannah River Nuclear Solutions (SRNS) have successfully reduced degreasing solvents beneath the Savannah River Site (SRS), using a technology that injects a form of iron and oil into groundwater.Office of Environmental Management
-
June 7, 2022The EM Richland Operations Office (RL) and contractor Hanford Mission Integration Solutions (HMIS) have appointed a new chief of Hanford Patrol, carrying on a tradition of experienced leadership for the protective force that safeguards the Hanford Site.Office of Environmental Management