More Resources
-
August 26, 2026The Knolls Laboratory L4 Pumphouse Sinkhole Repair Project is being undertaken to repair an existing concrete retaining wall along the edge of the Mohawk River where the river water flow is eroding the retaining wall and the surrounding shale rock face.Office of NEPA Policy and Compliance
-
August 26, 2026Hydrocarbons and Geothermal Energy Office
-
August 26, 2026The Office of Project Management (PM) provides a monthly assessment of DOE’s portfolio of capital assets projects, which is summarized in the monthly Project Dashboard report. The report lists all post-Critical Decision 2 (CD-2) active projects with established scope, schedule, and cost performance baselines.Office of Project Management
-
DocumentAugust 26, 2026August 2026 PM Project DashboardOffice of Project Management
-
August 26, 2026Read the archived issues of the Office of Geothermal's monthly newsletter, The Drill Down.Geothermal Technologies Office
-
August 26, 2026Transforming accelerator-based facilities into highly efficient, autonomous, and more productive capabilities requires a tight integration of AI with design and operation.Genesis Mission
-
August 26, 2026Examples of early market applications for fuel cells include specialty vehicles, emergency backup power, and prime power for critical loads.Alternative Fuels and Feedstocks Office
-
August 26, 2026Hydrocarbons and Geothermal Energy Office
-
August 26, 2026New AI models and advanced simulations can reduce costs, accelerate the discovery of next-generation construction materials and improve the design, operation, and longevity of the Nation's physical infrastructure.Genesis Mission
-
August 26, 2026The Nation cannot yet trace how the environments in which Americans live, together with lifestyle and genetic variation, drive disease across the life course.Genesis Mission