More Resources
-
December 31, 2025The landing page for U.S. Energy & Employment Report (USEER).Office of Policy
-
December 31, 2025There is some roof leakage in the 911 fan room louver house area of 105-L ( 26 level). The exact location of the leak needs to be pinpointed and re…Office of NEPA Policy and Compliance
-
December 31, 2025Disconnect and relocate double-wide trailer 773-68A from current location and install in N-Area for reuse. Double Wide trailer (773-68A) was transf…Office of NEPA Policy and Compliance
-
December 31, 2025F: Financial Considerations; I: Psychological ConditionsOffice of Hearings and Appeals
-
December 31, 2025This scope of work covers the removal and installation of the existing partitions and wall repair in the men's restroom at 725-N.…Office of NEPA Policy and Compliance
-
December 31, 2025CSX owns, operates, and maintains a north/south rail line on/adjacent SRS (which includes access to a 50-foot Rights of Way on both sides of center…Office of NEPA Policy and Compliance
-
December 31, 2025Removal of existing carbon analyzer and installation of newer model in Glovebox No. 54 in Building 773-A, B-139.…Office of NEPA Policy and Compliance
-
December 31, 2025This work will characterize contaminants of interest (238U, 90Sr, 129I, and 3H) in F-Area groundwater.…Office of NEPA Policy and Compliance
-
December 31, 2025The objective of this R and D project is to convert carbon and nitrogen sources to increased value liquid products via electrocatalysis using nanoc…Office of NEPA Policy and Compliance
-
December 31, 2025Metallic alloys will be heat treated and/or oxidized in a controlled atmosphere as needed to support hydrogen research covered in separate EECs and…Office of NEPA Policy and Compliance